Level Crossings Removal Project - Package 3 - Bayswater

This project by Laing O'Rourke achieved a 'Leading' As Built v1.1 IS Rating.

Overview

The Bayswater level crossing removal project will see the construction of a brand new Bayswater station and the removal of two dangerous and congested level crossings at Mountain Highway and Scoresby Road. Helping to create better cycling and pedestrian facilities, widening footpaths and bike lanes on Mountain Highway, and creating better connections into and around the station and activity centre. This level crossing removal will include:

  • Lowering the rail line below Mountain Highway and Scoresby Road.
  • Raising Mountain Highway at the point of the crossing to allow continued train access to the Train Maintenance Facility behind Bayswater Station.
  • Rebuilding Bayswater Station.
  • Platforms accessed via lifts, ramps and stairs.
  • Reconstructing the station car park, optimising parking and providing the same number of spaces.
  • Building a walking and cycling path.

Details


Awards

IS Outstanding Achievement Award 2016 - Design

IS Outstanding Achievement Award 2018 - As Built


Rating Highlights

Read a case study about this award-winning project.

 

Images